Master planning services for the 50-acre site location for the new $50m FedEx A380 Ramp and Hangar project also included construction plans and specifications for the grading and drainage portion of the project. A portion of the service road was also included as it impacted the new A380 site, along with the design of retaining walls and sound and visual barrier walls along Winchester Road and just north of the proposed 4-lane service road. The project was fast-tracked with a design completion date of 70 days. We also provided construction administration and construction inspection services.