MENU

Wolf River Boulevard Mill & Overlay Phase 2

TRANSPORTATION

We provided services to the City of Germantown for the $1.3m reconstruction and paving for portions of Wolf River Boulevard from Farmington Boulevard to the eastern City Limits with STP funding. The project consisted of partial reconstruction of existing pavement, milling, overlaying, sidewalk and handicap ramp construction. We prepared traffic control plans for this busy roadway and monitored the traffic control during construction and provided the CEI Services including inspection of asphalt milling, asphalt paving, concrete curb & gutter, sidewalk, and handicap ramps. The project also included the paperwork required for a Federally Funded Project including project closeout.